Data as of 25 Jul, 22:00 UTCpartial5 of 5 source measures incomplete · 4 notes
Cross-border
Loading Cross-border
Cross-Border Capacity
Cross-border capacity and flows
ENTSO-E physical flow, commercial flow and estimated NTC are shown where observed. Official 70% MACZT is not currently available.
Patterns shown are observations from public disclosure records. They do not constitute regulatory findings or determinations of wrongdoing.
Official 70% MACZT is unavailable. The previous percentage was a RAM/Fmax diagnostic built from incomplete JAO source rows, so it has been removed. Valid ENTSO-E flow and estimated NTC observations remain visible below.
Explicit auction utilisation is not available for this window. The map and table show ENTSO-E physical flow and estimated NTC where observed; these are different measures and are not an official MACZT result.
Window: 30-day. Each measure keeps its own source and coverage; these figures are not interchangeable.
Cross-border flow (avg)
7.8 GW
Sum of average physical flows across 10 observed directions.
Most loaded direction
CH → IT87%
Average physical flow as a share of estimated NTC.
Observed coverage
5borders
Physical borders with reviewed ENTSO-E flow observations in this window.
Cross-border flows
Average physical flow over the selected window · click a border to inspect
Loading map…
Select a direction on the map or table to inspect physical flow, commercial flow and estimated NTC observations.
Border directions
12 directed rows across 6 physical borders - click to inspect
Direction
Scheduled (avg MW)
Source
CH-IT
CH -> IT
2,193
2,554
2,533
87%
EST. NTC
DE-FR
FR -> DE
1,969
1,540
—
—
UNAVAILABLE
CH-FR
FR -> CH
1,065
2,106
2,083
51%
EST. NTC
CH-DE
CH -> DE
659
967
3,193
21%
EST. NTC
CH-AT
AT -> CH
557
299
846
66%
EST. NTC
CH-DE
DE -> CH
483
563
1,048
46%
EST. NTC
DE-FR
DE -> FR
414
971
—
—
UNAVAILABLE
CH-AT
CH -> AT
281
710
1,080
26%
EST. NTC
CH-FR
CH -> FR
175
268
1,248
14%
EST. NTC
CH-IT
IT -> CH
13
36
1,430
1%
EST. NTC
DK1-DE
DE -> DK
—
—
—
—
UNAVAILABLE
DK1-DE
DK -> DE
—
—
—
—
UNAVAILABLE
Averages over covered hours in the selected window. ENTSO-E A11 physical flow, A09 finalized schedules and A61 estimated NTC are separate measures. Official 70% MACZT is unavailable and is not inferred from them.