Loading UMM feed
Linking asset, country, and REMIT signalsBetween 09:00 and 17:00 there will be an FCR test program requiring G1 to run at variable loads (available capacity is the expected average). G2 has to run at a fixed load for the whole period (09-17) each day. Testing finished slightly earlier than expected on 03.06 and 04.06