Hydro Water Reservoir
SIMA G1 HYDRO
—
MW installed
Zone:
10YNO-0--------C
Country:
NO
60.50°N, 7.14°E
Identifiers
eic
50WG00000001476O
Outage History
6 events · 90 days
16 Jun 2026
18 Jun 2026
—
Nord Pool AS/EUIMSG-5EQMMDT0WK0VLTHNZX_003: Between 09:00 and 17:00 there will be an FCR test program requiring G1 to run at variable loads (available capacity is the expected average). G2 has to run at a fixed load for the whole period (09-17)
8 Jun 2026
8 Jun 2026
—
Nord Pool AS/EUIMSG-5EQMMDT0WK0VLTHNZX_003: Between 09:00 and 17:00 there will be an FCR test program requiring G1 to run at variable loads (available capacity is the expected average). G2 has to run at a fixed load for the whole period (09-17)
3 Jun 2026
5 Jun 2026
—
Nord Pool AS/EUIMSG-5EQMMDT0WK0VLTHNZX_003: Between 09:00 and 17:00 there will be an FCR test program requiring G1 to run at variable loads (available capacity is the expected average). G2 has to run at a fixed load for the whole period (09-17)
15 Apr 2026
15 Apr 2026
—
Nord Pool AS/EUIMSG-5EQMMDT0WK0VLTHNZX_003: Between 09:00 and 17:00 there will be an FCR test program requiring G1 to run at variable loads (available capacity is the expected average). G2 has to run at a fixed load for the whole period (09-17)
7 Apr 2026
10 Apr 2026
—
Nord Pool AS/EUIMSG-5EQMMDT0WK0VLTHNZX_003: Between 09:00 and 17:00 there will be an FCR test program requiring G1 to run at variable loads (available capacity is the expected average). G2 has to run at a fixed load for the whole period (09-17)
23 Mar 2026
7 Apr 2026
—
Nord Pool AS/EUIMSG-5EQMMDT0WK0VLTHNZX_003: Between 09:00 and 17:00 there will be an FCR test program requiring G1 to run at variable loads (available capacity is the expected average). G2 has to run at a fixed load for the whole period (09-17)
Related UMMs
—
Newest first
Oldest first
Loading…
Statistical Context
Asset Outage Pattern
Outages (90 days)
6
—
Mean duration
93.2 hours
—
Median unavailable capacity
0 MW
—
Comparison groups contain fewer than 3 distinct market participants
2026-02-08T00:00:00+00:00 to 2026-06-11T18:10:37.021955+00:00