Loading UMM feed
Linking asset, country, and REMIT signalsAs part of this outage, Greenlink will be conducting a short test from 0600 to 0945 on the 22nd June. The interconnector will ramp from 0MW at 0600 to deliver 510MW by 0750 in the GB to SEM direction. At 0800 the interconnector will then ramp to 0MW by 0945 and the outage will then commence. Values subject to change depending on system conditions. Updates will be provided as required.