Loading UMM feed
Linking asset, country, and REMIT signalsPeriod 1: repair of gasturbine and minor limitation on main boiler. Period 2: repair of gasturbine and minor limitation on main boiler, and a limitation on AVV2 where it only can produce 355 mw. Period 3: repair of gasturbine and minor limitation on main boiler, fan speed drops, then the unit trips