Hydro Water ReservoirNOActiveProduction unavailability
CAPACITY AFFECTED
120 MW
EVENT WINDOW
28 May 2026 → 29 May 2026
P1: Rana station will need minimum 100MW load between 27/5 20:00 - 28/5 06:00 to prepare for the test.
P2: Fixed loadplan for Rana station between 68 and 133 MW for Rana station